3 MW Aradan Power Plant
The Aradan 3 MW power plant project is the company’s first megawatt-scale project, which, despite the occurrence of war during the contract duration, was completed successfully without any delays and is currently in operation. This project, with the impactful collaboration of Client’s team and our team, is of such quality that it is now recognized as a prominent example and a model for similar projects at both regional and national levels.
Additional information
- Installation, Commissioning & Operation
- Tavan Energy Source Development Organization
- Start May 2025
- End July 2025
- Number of Installed Panels 5244
- Panel Brand Yingli Solar - YL575-50e 1/2
- Number of Installed Inverters 23
- Inverter Brand and Model Sungrow-SG-125-CX-2P
- Number of Transformers / Compact Substations 2
- Transformer / Compact Substation Rating and Model Iran Transfo - 1600kVA
- Total DC Cable Length 22000 meters
- Number of Mounting Tables (Structures) 138
- Power Plant Area 4.5 hectares
- Aradan / Semnan
- The project is completed.
Project progress percentage
100%